Latest Projects delivered successfully

M/V "LIBERTY WAVE" Emergency Steel Work during cargo discharge, Hull-Shell repair within 16 hrs.

LPG "POLAR VIKING" Manifold conversion works, New stainless steel manifold outlet and stainless steel pipe sections have been designed, fabricated and installed on board.

M/V "LT BIANCA" Emergency Steel Work, Damaged Container posts have been fabricated, aligned and installed on board within 60 hrs.

LPG "PACIFIC VIKING" Manifold conversion works, New stainless steel manifold outlet and stainless steel pipe sections have been designed, fabricated and installed on board.

M/V "HAWK I" Emergency Tank Cleaning, All cargo tanks and FO tanks have been cleaned, gas freed within 48 hrs.

M/V "WARRIOR" Emergency Pump Repair, Emergency Fire Pump has been repaired.

MSC "IDIL" Emergency Steel Work, Damaged shell due to a port accident, Damaged area has been repaired with internals within 48 hrs round the clock working.

M/V "VERGI" Steel Work, pre-fabricated steel parts

R/R "VANS QUEEN" Project Management Service, management of 1,5 M USD repair project which has been carried out in Tuzla Shipyard

NEW-BUILDING 1000 tons of steel production has been delivered by our subsidiary company Prizma Ltd. to a competitive shipyard in Tuzla Bay.

M/V "ORIANA C" Floating Repair, major steel work on deck and forepeak areas.

P&O NEDLLOYD "CHEEKKA" Emergency Repair, Cargo crane problem while discharging - Our team reached to the vessel rapidly and problem has been solved within 6 hours, Cargo block pins have been renewed with new ones fabricated in our workshop.

M/V "CORDOBA GRANADA ANDALUCIA" Steel Work, pre-fabricated steel parts

CMA CGM "SWALA" Various Mechanical, pipe and electrical works have been carried out